User Tools

Site Tools


steercom:2010-12

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
steercom:2010-12 [2010/12/01 19:16]
SLUUG Administration First save during meeting. (CMB)
steercom:2010-12 [2010/12/01 20:06] (current)
SLUUG Administration Last save during meeting. (CMB)
Line 12: Line 12:
 ====== Date and Time ====== ====== Date and Time ======
   * Wednesday, December 1, 2010   * Wednesday, December 1, 2010
-  * 6:30 PM - +  * 6:30 PM - 8:10 PM
  
 ====== Attendees ====== ====== Attendees ======
Line 162: Line 162:
 ==== HZWLUG - December 28 ==== ==== HZWLUG - December 28 ====
   * [[http://​hzwlug.sluug.org |HZWLUG]] topics are usually determined by attendees. ​ We sometimes cover more than one.   * [[http://​hzwlug.sluug.org |HZWLUG]] topics are usually determined by attendees. ​ We sometimes cover more than one.
 +  * Stan may not be able to make it to run the meeting.
  
 ===== January 2011 ===== ===== January 2011 =====
Line 180: Line 181:
 ==== SLUUG - January 12 ==== ==== SLUUG - January 12 ====
   * [[http://​www.sluug.org/​|SLUUG]] usually starts with a tutorial or demo session before a main presentation.   * [[http://​www.sluug.org/​|SLUUG]] usually starts with a tutorial or demo session before a main presentation.
-  * BASE: To Be Determined (TBD) +  * BASE: BSD Jails by Lee Lammert 
-  * MAIN: Comparison of ARM and Atomby Jerry Stutte+  * MAIN: Comparison of ARM and Atom by Jerry Stutte
  
 ==== SNUG - January 19 ==== ==== SNUG - January 19 ====
Line 189: Line 190:
 ==== STLLUG - January 20 ==== ==== STLLUG - January 20 ====
   * [[http://​www.stllinux.org/​|STLLUG]] is the St. Louis Linux Users Group.   * [[http://​www.stllinux.org/​|STLLUG]] is the St. Louis Linux Users Group.
-  * TOPIC: ​To Be Determined ​(TBD)+  * TOPIC: ​Setting Up Webalizer by Lee Lammert ​(tentative)
  
 ==== HZWLUG - January 25 ==== ==== HZWLUG - January 25 ====
Line 215: Line 216:
   * [[http://​www.sluug.org/​|SLUUG]] usually starts with a tutorial or demo session before a main presentation.   * [[http://​www.sluug.org/​|SLUUG]] usually starts with a tutorial or demo session before a main presentation.
   * BASE: To Be Determined (TBD)   * BASE: To Be Determined (TBD)
-  * MAIN: To Be Determined ​(TBD)+  * MAIN: Cyber Security by Ruben Lopez (tentative, via Jerry)
  
 ==== SNUG - February 16 ==== ==== SNUG - February 16 ====
Line 223: Line 224:
 ==== STLLUG - February 17 ==== ==== STLLUG - February 17 ====
   * [[http://​www.stllinux.org/​|STLLUG]] is the St. Louis Linux Users Group.   * [[http://​www.stllinux.org/​|STLLUG]] is the St. Louis Linux Users Group.
-  * TOPIC: ​To Be Determined ​(TBD)+  * TOPIC: ​Video Capture and Editing by Noah Lance (tentative)
  
 ==== HZWLUG - February 22 ==== ==== HZWLUG - February 22 ====
Line 292: Line 293:
   * 2010-11   * 2010-11
     * We have 2 new boxes.     * We have 2 new boxes.
-      * Compaq ​DL580s ​(G1) at Lee's house.+      * Compaq ​DL580 (G1) boxes at Lee's house. 
 +      * 4 x 73 GB disks (old servers have 4 x 18GB) 
 +      * 3 GB RAM (old servers have 4 GB)
     * Work party to finish moving bud to the cloud box - Nov 13th at Lee's.     * Work party to finish moving bud to the cloud box - Nov 13th at Lee's.
   * 2010-12   * 2010-12
-    * +    * Got Budlight back up and runnable 
 +      * Got a fan to fit in it 
 +      * Need to reinstall in rack 
 +    * Got OS installed on DL580, but Grub didn't work. 
 +    * Lee suggested we keep 1 of each system type. 
 +      * Keep the 2nd of each system type as backup hardware.
  
 ===== Wash U Cleanup ===== ===== Wash U Cleanup =====
Line 312: Line 320:
   * 2010-10 No progress. Stan questioned Gary's usefulness. ​ Suggested that he is merely decorative.   * 2010-10 No progress. Stan questioned Gary's usefulness. ​ Suggested that he is merely decorative.
   * 2010-11 No progress. See note above about Gary's usefulness.   * 2010-11 No progress. See note above about Gary's usefulness.
-  * 2010-12 +  * 2010-12 ​No progress. See note above about Gary's usefulness.
-    * +
  
 ===== Purge SYSADMIN mailing list ===== ===== Purge SYSADMIN mailing list =====
-  * 2009-12 ​Stan R. would like us to clean up the SYSADMIN ​mailing ​list, to eliminate people who have not been active ​for the past year+  * Stan went through ​SYSADMIN list, looking ​for inactive members
-    * We decided to send a message out to the listasking who wants to stay on the list. Then we can remove folks that are not staying active. +    * Found only 1 inactive member, and removed him.
-  * 2010-05 This project open since December. +
-  * 2010-06 Not finished +
-  * 2010-07 Sent warning of purge on 30 June to SYSADMIN ​and STEERCOM mailing lists. +
-    * Gary M. and Stan R. will determine exceptions. +
-  * 2010-08 Status unchanged. +
-  * 2010-09 Status unchanged. +
-  * 2010-10 Stan will delete inactive names from SYSADMIN and will post warning message to STEERCOM advising of purge of inactive members. +
-  * 2010-11 Status unchanged. +
-  * 2010-12 +
-    *  +
  
 ===== Password Cards ===== ===== Password Cards =====
Line 340: Line 336:
   * 2010-10 Mike Knight, Jerry, and Don all need password cards. Jeff sent mail to Craig inquiring.   * 2010-10 Mike Knight, Jerry, and Don all need password cards. Jeff sent mail to Craig inquiring.
   * 2010-11 Jerry received a password card from Craig.   * 2010-11 Jerry received a password card from Craig.
-  * 2010-12 +  * 2010-12 ​Status unchanged.
-    * +
  
 ===== Linux Conference in May ===== ===== Linux Conference in May =====
Line 356: Line 351:
   * 2010-10 Carl will investigate.   * 2010-10 Carl will investigate.
   * 2010-11 Craig will investigate.   * 2010-11 Craig will investigate.
-  * 2010-12 +  * 2010-12 ​Craig will investigate.
-    * +
  
 ===== SNUG Future ===== ===== SNUG Future =====
Line 363: Line 357:
   * Gary Hollingsworth expects Novell to pull out of Linux.   * Gary Hollingsworth expects Novell to pull out of Linux.
     * Novell will be divesting its Linux business to VMware and the remaining assets to Attachmate.     * Novell will be divesting its Linux business to VMware and the remaining assets to Attachmate.
-    * Assume worst case that SNUG - St. Louis Novell Users Group will possibly ​disolve.+    * Assume worst case that SNUG - St. Louis Novell Users Group will possibly ​dissolve.
     * Need confidential recommendations on SNUG funds.     * Need confidential recommendations on SNUG funds.
     * There was no October meeting because of STL Business Expo.     * There was no October meeting because of STL Business Expo.
Line 370: Line 364:
     * Future of the group will be discussed this month.     * Future of the group will be discussed this month.
   * 2010-12   * 2010-12
-    * +    * Was not discussed last month. 
 +    * We should defer this discussion until Attachmate buy-out settles out.
  
 ===== Domain Name Renewals ===== ===== Domain Name Renewals =====
Line 376: Line 371:
   * For December 2010 - Renew STCLUG.ORG domain. ​ Our other domains scattered through out year.   * For December 2010 - Renew STCLUG.ORG domain. ​ Our other domains scattered through out year.
   * Suggestion was made that it might be possible to renew all domains during same month.   * Suggestion was made that it might be possible to renew all domains during same month.
-  * Gary M. was going to check the possibility with vendors. +  * Gary is going to check the possibility with vendors.
-  * 2010-12 +
-    * +
  
 ===== STLLUG Sponsorship Credit ===== ===== STLLUG Sponsorship Credit =====
Line 387: Line 380:
   * Lee updated the SLUUG web site [[http://​www.sluug.org/​sponsors/​|sponsors list]]   * Lee updated the SLUUG web site [[http://​www.sluug.org/​sponsors/​|sponsors list]]
     * Also added PayPal button to SLUUG web site [[http://​www.sluug.org/​members/​join/​|membership join page.]]     * Also added PayPal button to SLUUG web site [[http://​www.sluug.org/​members/​join/​|membership join page.]]
-  * 2010-12 +  * 2010-12 ​No status change. 
-     +  We should push the PayPal usage.
- +
-====== New Business ======+
  
 ===== Recording Meetings ===== ===== Recording Meetings =====
Line 405: Line 396:
     * Alternative of video recording suggested, huge size of video files was mentioned.     * Alternative of video recording suggested, huge size of video files was mentioned.
     * Stan R. passed voice recorder to Gary M. on 18 November and doesn'​t want it back.     * Stan R. passed voice recorder to Gary M. on 18 November and doesn'​t want it back.
-    * +    * Noah volunteered an old Digital8 recorder. 
 + 
 +====== New Business ======
  
 ===== Preparation for February Annual Meeting and Elections ===== ===== Preparation for February Annual Meeting and Elections =====
-  * 2010-12 +  * Annual Official Business Meeting is 2nd Wednesday in February. 
-     +  Elections are all the February meetings. 
- +  * All votes will be counted at the Steering Committee meeting. 
-===== Anything Else ??? ===== +    * On the 1st Wednesday in March.
-  * 2010-12 +
-    * +
  
 ====== Annual Requirements ====== ====== Annual Requirements ======
Line 425: Line 416:
   * October 2011 - Reserve rooms at St. Louis County Library Branches.   * October 2011 - Reserve rooms at St. Louis County Library Branches.
   * October 2011 - St. Louis Business Expo   * October 2011 - St. Louis Business Expo
 +  * December 2011 - Renew STCLUG.ORG domain.
   * August 2012 - Missouri Annual Report for Corporate Legal Status (every 2 years).   * August 2012 - Missouri Annual Report for Corporate Legal Status (every 2 years).
  
 ====== Blue Sky ====== ====== Blue Sky ======
-  * Speculate ​on eventsplans, policy, procedures, projects+  * Gary spoke about the difficulties we have finding current information ​on all the upcoming meetings. 
-  * +    * SLUUG calendar is relatively definitivebut the original sources are often out of date
 +  * Stan talked about the order of the Steering Committee agenda. 
 +    * Suggested that it might be better to have new topics at the top. 
 +    * This would allow new members to come and have input right away. 
 +    * Gary suggested that the first item on the agenda should be agenda changes. 
 +  * Stan and Gary suggested posting post-meeting wrap-ups to DISCUSS. 
 +    * Things like posting the "​Recognize Useful Efforts"​ section from the Steering minutes every month. 
 +    * Summary of Steering Committee minutes. 
 +    * Highlights of presentations. 
 +    * Questions (and answers) from Q&A sessions from presentations. 
 +  * Stan wanted to gather web analytics. 
 +    * Craig said that there are 2 ways to accomplish this. 
 +      * Way 1 is to analyze Apache logs, such as webalizer. 
 +      * Way 2 is to use something like Google Analytics. 
 +    * The group decided against using anything external like Google for this.
  
 ====== Recognize Useful Efforts ====== ====== Recognize Useful Efforts ======
   * Recognize completed action items, and other useful actions.   * Recognize completed action items, and other useful actions.
   * Who did what?   * Who did what?
 +  * Nothing to report.
  
 ====== Follow-up and Action Items ====== ====== Follow-up and Action Items ======
Line 439: Line 446:
   * Everyone - Talk to someone about sponsorships.   * Everyone - Talk to someone about sponsorships.
   * Everyone - Talk to someone about giving a presentation.   * Everyone - Talk to someone about giving a presentation.
-  * Gary - follow up with Noel about transferring the SLACC.COM domain to us. 
-  * Gary - get Wash U site cleaned up. 
   * Carl - send thank-you note to Hostirian for hosting our servers.   * Carl - send thank-you note to Hostirian for hosting our servers.
   * Craig - change root passwords; make sure Mike Knight and Don Ellis have a copy of the password card.   * Craig - change root passwords; make sure Mike Knight and Don Ellis have a copy of the password card.
Line 446: Line 451:
     * Or transfer the 2 months to SLACC or HZWLUG.     * Or transfer the 2 months to SLACC or HZWLUG.
   * Craig - follow up on potential presentations.   * Craig - follow up on potential presentations.
-    * Kyle Cordes - ffmpeg or other 
     * Igor - blind Linux users     * Igor - blind Linux users
 +    * Kyle Cordes - ffmpeg or other
   * Jerry - find someone to talk to us about Android.   * Jerry - find someone to talk to us about Android.
     * Talk to Joshua Frank and Bill Zimmerly.     * Talk to Joshua Frank and Bill Zimmerly.
Line 455: Line 460:
   * Noah - work on Amber build.   * Noah - work on Amber build.
   * Gary - look into syncing domain renewals so they all happen at the same time of year.   * Gary - look into syncing domain renewals so they all happen at the same time of year.
 +  * Gary - renew STCLUG.ORG domain!!!! 
 +  * Gary - follow up with Noel about transferring the SLACC.COM domain to us. 
 +  * Gary - get Wash U site cleaned up.
steercom/2010-12.1291252599.txt.gz · Last modified: 2010/12/01 19:16 by SLUUG Administration