User Tools

Site Tools


steercom:2014-03

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
steercom:2014-03 [2014/03/05 10:02]
127.0.0.1 external edit
steercom:2014-03 [2014/03/05 20:22] (current)
SLUUG Administration Last save during meeting.
Line 26: Line 26:
  
   * Wednesday, March 5, 2014   * Wednesday, March 5, 2014
-  * 6:30 PM -+  * 6:30 PM - 8:20 PM
  
 ====== Attendees ====== ====== Attendees ======
  
-:?:  ​* Craig Buchek +  ​* Craig Buchek 
- +  * Andrew Latham 
-:?:  * Andrew Latham +  * Lee Lammert 
- +  * Gary Meyer 
-:?:  * Lee Lammert +  * Stan Reichardt 
- +  * Don Weiman
-:?:  * Gary Meyer +
- +
-:?:  * Jeff Muse +
- +
-:?:  * Stan Reichardt +
- +
-:?:  * Don Weiman+
  
 ====== Count Ballots ====== ====== Count Ballots ======
  
   * Count ballots **before** usual meeting items.   * Count ballots **before** usual meeting items.
-:?:  ​* Ballots separated from envelopes and counted +  ​* Ballots separated from envelopes and counted 
-  * We had xx voters ​(were all eligible?)+  * We had 9 eligible ​voters
   * Results:   * Results:
-:?:  ​* Board Member - Don Weiman  +    ​* Board Member - Don Weiman 
-  * President - Gary Meyer (incumbent) +    * President - Gary Meyer (incumbent) 
-  * Vice President - Stan Reichardt (incumbent) +    * Vice President - Stan Reichardt (incumbent) 
-  * Secretary - Craig Buchek (incumbent) +    * Secretary - Craig Buchek (incumbent) 
-  * Treasurer - Lee Lammert (incumbent) +    * Treasurer - Lee Lammert (incumbent) 
-  * Chairman of STLLUG - Craig Buchek ​(incumbent+    * Chairman of STLLUG - Andrew Latham 
- +  * Board meeting was held 
 +    * Board member attendees:​ 
 +      * Stan Reichardt 
 +      * Don Weiman 
 +      * Jeff Muse (by proxy via Lee Lammert
 +    * Stan called meeting to order 
 +    * Board unanimously accepted the results of the voting 
 +    * Stan asked if there is any other business 
 +      * No other business was brought up 
 +    * Stan moved to close the meeting 
 +      * Jeff/Lee seconded 
 +    * Meeting was adjourned
  
  
Line 63: Line 66:
  
   * Are there any additions, deletions, or changes to sequence of items in the prepared agenda?   * Are there any additions, deletions, or changes to sequence of items in the prepared agenda?
- 
  
 ====== Secretary Report ====== ====== Secretary Report ======
Line 71: Line 73:
 ====== Treasurer Report ====== ====== Treasurer Report ======
  
-|Balance as of  1/1 ^ $2,580.51 ^           ^ ^+|Balance as of  1/1 ^ $2,459.75 ^           ^ ^
 | Payments (-)      ^           ​^ ​    17.49 ^ Dotster ^ | Payments (-)      ^           ​^ ​    17.49 ^ Dotster ^
-                  ^           ^    103.27 ^ StLLUG Pizza - N&​E ​+Receipts (+)      ​^    103.27 ​^           ^ StLLUG Pizza - N&​E ​Reimbursement from Contegix ​
-| Receipts (+)      ^      0.00 ^           ​^ ​+|Balance as of 1/31 ^           ^ $2,545.43 ^ ^
-|Balance as of 1/31 ^           ^ $2,459.75 ^ ^+
  
-Note: Reimbursement received from Contegix, deposited in February. 
  
 ====== Attendance Report ====== ====== Attendance Report ======
Line 162: Line 162:
     * Annual Board Meeting     * Annual Board Meeting
     * MAIN: Intellectual Property: The Good, the Bad, & the Ugly in 1.5 Hours      * MAIN: Intellectual Property: The Good, the Bad, & the Ugly in 1.5 Hours 
-      * by Scott Granneman and Denise Lieberman  +      * by Scott Granneman and Denise Lieberman 
-      * music was good; but, caused DRM disputes when posted to YouTube +      * Music was good; but, caused DRM disputes when posted to YouTube
-      * +        * Cleared in some countries, but not all. 
 +      * Good, but not as good as a typical Granneman presentation.
  
 ==== Valentines Day - February 14 ==== ==== Valentines Day - February 14 ====
Line 170: Line 171:
 ==== SNUG - February 19 ==== ==== SNUG - February 19 ====
   * [[http://​snug.sluug.org/​|SNUG]] is the St. Louis Novell Users Group lunch time meeting.   * [[http://​snug.sluug.org/​|SNUG]] is the St. Louis Novell Users Group lunch time meeting.
 +  * Balloting offered
   * TOPIC: Novell Enablement Webinar: GroupWise 2014   * TOPIC: Novell Enablement Webinar: GroupWise 2014
-    * Balloting offered +    * Interesting - capable alternative to Exchange
-    * +
  
 ==== STLLUG - February 20 ==== ==== STLLUG - February 20 ====
   * [[http://​www.stllinux.org/​|STLLUG]] is the St. Louis Linux Users Group.   * [[http://​www.stllinux.org/​|STLLUG]] is the St. Louis Linux Users Group.
-  * TOPIC: Docker by Steven Borrelli ​(confirmed, via Andrew) +  ​* Balloting offered 
-    * Balloting offered +  ​* TOPIC: Docker by Steven Borrelli 
-    * +    * Good. Brought in quite a few new people. 
 +    * Excellent topic for our group.
  
 ==== HZWLUG - February 25 ==== ==== HZWLUG - February 25 ====
Line 187: Line 189:
     * Side topics such as using xman and modifying folder graphics also took up time.  ​     * Side topics such as using xman and modifying folder graphics also took up time.  ​
     * Overall, the demonstration on using VirtualBox really didn't have enough time to do it justice.     * Overall, the demonstration on using VirtualBox really didn't have enough time to do it justice.
-    * Chris Jones donated ACER netbook with LinuxMint 16 installed. ​ Given away as a door prize by drawing names from a hat.+    * Chris Jones donated ACER netbook with LinuxMint 16 installed. 
 +      * Given away as a door prize by drawing names from a hat.
     * Meeting summary posted on DISCUSS mailing list.     * Meeting summary posted on DISCUSS mailing list.
-    *  
  
 ====== Schedule ====== ====== Schedule ======
Line 208: Line 210:
   * Link to [[/​steercom/​minutes|past minutes and agenda]].   * Link to [[/​steercom/​minutes|past minutes and agenda]].
   * Link to [[/​steercom/​potential]] tutorials, topics and speakers.   * Link to [[/​steercom/​potential]] tutorials, topics and speakers.
-  * Count ballots **before** meeting 
  
 ==== SLACC - March 6 ==== ==== SLACC - March 6 ====
Line 216: Line 217:
   * [[http://​www.sluug.org/​|SLUUG]]   * [[http://​www.sluug.org/​|SLUUG]]
     * BASE: Curl and wget by Craig Buchek     * BASE: Curl and wget by Craig Buchek
-    * MAIN: To Be Determined (TBD)+    * MAIN: ChromeOS by Andrew Latham
  
 ==== SNUG - March 19 ==== ==== SNUG - March 19 ====
Line 224: Line 225:
 ==== STLLUG - March 20 ==== ==== STLLUG - March 20 ====
   * [[http://​www.stllinux.org/​|STLLUG]] is the St. Louis Linux Users Group.   * [[http://​www.stllinux.org/​|STLLUG]] is the St. Louis Linux Users Group.
-  * TOPIC: ​The Zimbra Mail Server ​- Contegix, ​Jesse Rehme, Lead Engineer +  * TOPIC: Zimbra Mail Server ​by Jesse Rehme, Lead Engineer ​at Contegix (confirmed, ​via Lee) 
-    * via LVL+
 ==== HZWLUG - March 25 ==== ==== HZWLUG - March 25 ====
   * [[http://​hzwlug.sluug.org |HZWLUG]] topics are usually determined by attendees. ​ We usually cover more than one topic.   * [[http://​hzwlug.sluug.org |HZWLUG]] topics are usually determined by attendees. ​ We usually cover more than one topic.
Line 241: Line 242:
 </​code>​ </​code>​
  
 +  * Potentials for April UNIX or STLLUG meetings:
 +    * Gaming on Linux (via Gary)
 +    * Krita (via Gary)
 +    * Civic Hacking with Big Data (via Gary)
  
 ==== STEERCOM - Steering Committee - April 2 ==== ==== STEERCOM - Steering Committee - April 2 ====
Line 249: Line 254:
   * [[http://​slacc.sluug.org/​|SLACC]] usually holds a Linux configuration workshop - no presentation   * [[http://​slacc.sluug.org/​|SLACC]] usually holds a Linux configuration workshop - no presentation
  
-==== STL Busines ​Expo - April 8 ====+==== STL Business ​Expo - April 8 ====
   * SLUUG Linux booth   * SLUUG Linux booth
  
Line 255: Line 260:
   * [[http://​www.sluug.org/​|SLUUG]]   * [[http://​www.sluug.org/​|SLUUG]]
     * BASE: To Be Determined (TBD)     * BASE: To Be Determined (TBD)
-    * MAIN: To Be Determined (TBD)+    * MAIN: To Be Determined (TBD) (See above.)
  
 ==== SNUG - April 16 ==== ==== SNUG - April 16 ====
Line 263: Line 268:
 ==== STLLUG - April 17 ==== ==== STLLUG - April 17 ====
   * [[http://​www.stllinux.org/​|STLLUG]] is the St. Louis Linux Users Group.   * [[http://​www.stllinux.org/​|STLLUG]] is the St. Louis Linux Users Group.
-  * TOPIC: To Be Determined (TBD)+  * TOPIC: To Be Determined (TBD) (See above.)
  
 ==== HZWLUG - April 22 ==== ==== HZWLUG - April 22 ====
Line 382: Line 387:
   * 2014-01 ​   * 2014-01 ​
     * Some discussion on how to move forward.     * Some discussion on how to move forward.
-  * 2014-03 
-    *  
  
 ===== Uploading Presentations ===== ===== Uploading Presentations =====
Line 403: Line 406:
       * Problem with camera and power, so we only got first parts of meetings.       * Problem with camera and power, so we only got first parts of meetings.
   * 2014-03   * 2014-03
-    * +    * Andrew would like some feedback. 
 +    * Sound quality is really good. 
 +    * He's been using a Logitech HD Pro Webcam C920 ($80)
  
 ===== Domain Name Tracking ===== ===== Domain Name Tracking =====
Line 442: Line 447:
   * 2014-02 Gary renewed STLLINUX.ORG;​ needs to document the process.   * 2014-02 Gary renewed STLLINUX.ORG;​ needs to document the process.
   * 2014-03   * 2014-03
-    * +    * Lee has them set to auto-renew.
  
 ===== Publicity ===== ===== Publicity =====
Line 456: Line 461:
     * Might want to hand out business cards.     * Might want to hand out business cards.
   * 2014-03   * 2014-03
-    * +    * The SLUUG calendar is being referenced at other groups. 
 +      * It's a nice way for us to keep our name out there. 
 +    * The Google Plus group is also helping a bit.
  
 ===== Sponsorship Offers ===== ===== Sponsorship Offers =====
Line 467: Line 474:
   * 2014-01 ​   * 2014-01 ​
     * No movement.     * No movement.
-  * 2014-03 
-    *  
  
 ===== JOINT Meetings ===== ===== JOINT Meetings =====
Line 477: Line 482:
   * 2014-01 ​   * 2014-01 ​
     * No movement.     * No movement.
-  * 2014-03 
-    *  
  
 ===== Pamphlets ===== ===== Pamphlets =====
Line 515: Line 518:
     * No movement.     * No movement.
   * 2014-03   * 2014-03
-    * +    * Stan is burnt out.
  
 ===== Penguins ===== ===== Penguins =====
Line 530: Line 533:
   * 2014-01 Andrew gave Gary a penguin he found at Goodwill for $0.50.   * 2014-01 Andrew gave Gary a penguin he found at Goodwill for $0.50.
   * 2014-02 Andrew gave Gary a large penguin he found at Goodwill for $2.00.   * 2014-02 Andrew gave Gary a large penguin he found at Goodwill for $2.00.
-  * 2014-03 +  * 2014-03 ​Andrew has not made it to Goodwill lately, but finished sewing his 1st penguin.
-    * +
  
 ===== Science Center ===== ===== Science Center =====
Line 538: Line 540:
     * Maybe next month?     * Maybe next month?
   * 2013-09 No movement.   * 2013-09 No movement.
-  * 2014-02 
-    *  
  
 ===== Internet Presence ===== ===== Internet Presence =====
Line 563: Line 563:
     * Andrew did the video uploads via Google Hangouts On Air     * Andrew did the video uploads via Google Hangouts On Air
   * 2014-03   * 2014-03
-    * +    * Andrew did more stuff on the Google+ pages.
  
 ===== STLLUG Location ===== ===== STLLUG Location =====
Line 571: Line 571:
     * Andrew will look into Richmond Heights Community Center     * Andrew will look into Richmond Heights Community Center
   * 2014-03   * 2014-03
-    * +    * No movement.
  
 ===== Web Site Maintenance ===== ===== Web Site Maintenance =====
Line 628: Line 628:
     * Andrew has access, but needs some permission changes.     * Andrew has access, but needs some permission changes.
     * Andrew has root access on Amber now.     * Andrew has root access on Amber now.
-  * 2014-03 
-    * Andrew is working on a proof of process of switching to a style library like bootstrap. ​ Standard libraries have benefits so we can go halfway to CMS land. 
  
 ====== New Business ====== ====== New Business ======
  
-===== SLUUG Web Site Alternative ​Offer ===== +===== SLUUG Web Site Alternative ​Offers ​=====
-  * 2014-03 +
-  * Scott Granemann indicated our current web site sucks for mobile users. +
-  * Would we consider switching over for minimal monthly fee?   +
-  * Learning admin shouldn'​t be significant. ​ Harry (John) Hodges of Graybar offered assistance. +
-  * On going issue is resources (need more than one volunteer). ​+
   * FYI Webalizer [[http://​www.sluug.org/​hitreport/​ | report]].   * FYI Webalizer [[http://​www.sluug.org/​hitreport/​ | report]].
-  * Both Noah Lance and Craig Buchek have been working ​on "​new"​ web pages. +  * Both Noah Lance and Craig Buchek have worked ​on "​new"​ web pages in the past
-  * What other problems would we run into? +  * 2014-03: Scott Granemann indicated our current web site sucks for mobile users. 
-    * Anything else? +    * He proposed ​we switch over to using their service for minimal monthly fee. 
-    *  +    * They would redesign the site for us and host on their CMS. 
-  * Andrew suggests ​that we can use easy CMS solutionsExamplehttp://​monstra.org/​ does not use a database+    * Learning to manage content on their CMS shouldn'​t be significant. 
 +      * Harry (John) Hodges of Graybar offered assistance. 
 +  * 2014-03: Our needs: 
 +    * We have 2 web sites that we need to update. 
 +    * Better appearance 
 +      * Especially on mobile 
 +    * Easier to maintain 
 +      * Web interface 
 +      * Easier for multiple people to edit 
 +    * Our on-going issue is finding people to find the time to help. 
 +  * 2014-03Andrew'​s proposal: 
 +    * First, redesign static content of existing site(s) 
 +      * LUG first, then UUG page 
 +      * Using Bootstrap CSS framework (helps with mobile) 
 +    * Second, ​use Monstra (static site builder with no DB required) 
 +  * 2014-03: Steering committee decided to go with Andrew'​s proposal for now
 +    * Keeps our current hosting. 
 +    * Smaller incremental changes, that we're more comfortable with. 
 +    * More done by our members.
  
 ===== STL Business Expo ===== ===== STL Business Expo =====
   * 2014-03   * 2014-03
-  ​* Next on Tuesday, 8 April at St. Charles Convention Center, ​Emabassy ​Suites (off 5th Street, old FairGrounds area). +    ​* Next one is on Tuesday, 8 April 
-  * Stan R. asked Tony Lavasco if EPC would provide a copy of the [[http://​www.sluug.org/​images/​nexradix_at_epc.jpg | Nexradix Linux poster]] for our booth.  +      * At St. Charles Convention Center, ​Embassy ​Suites (off 5th Street, old FairGrounds area). 
-  * We need to call for volunteers during March meetings.+    * Stan R. asked Tony Lavasco if EPC would provide a copy of the [[http://​www.sluug.org/​images/​nexradix_at_epc.jpg | Nexradix Linux poster]] for our booth.  
 +    * We need to call for volunteers during March meetings.
     * Anything else?     * Anything else?
-    *  
  
-===== Anything Else New ? =====+===== Anything Else New? =====
   * 2014-03   * 2014-03
-    * Anything? +    * For future consideration:​ should we move the Steering Committee meeting earlier?
-    * +
  
 ====== Recognize Useful Efforts ====== ====== Recognize Useful Efforts ======
   * 2014-03   * 2014-03
-    * Anything? +    * Andrew - for stepping into LUG Chair position. 
-    * +    * Andrew - for video and Google+. 
 +    * Stan - for continuing work on calendar and ANNOUNCE list.
  
 ====== Blue Sky Ideas ====== ====== Blue Sky Ideas ======
   * 2014-03   * 2014-03
     * Anything?     * Anything?
-    *  
  
 ====== Recurring Requirements ====== ====== Recurring Requirements ======
steercom/2014-03.1394035329.txt.gz · Last modified: 2014/03/05 18:47 (external edit)