User Tools

Site Tools


steercom:2008-08

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Last revision Both sides next revision
steercom:2008-08 [2008/08/06 21:41]
24.107.97.176
steercom:2008-08 [2008/08/11 15:45]
70.242.159.89 HZWLUG September date will be one week later than normal. - stan r.
Line 219: Line 219:
   * TOPIC2: Partitions   * TOPIC2: Partitions
   * TOPIC 3: Anything else.   * TOPIC 3: Anything else.
 +
 +**Meeting date will be switched to 30 September**
  
 ==== STCLUG - September 25 ==== ==== STCLUG - September 25 ====
Line 315: Line 317:
     * Tim Dreste might be able to get someone from Todd Akin's office to speak with us.     * Tim Dreste might be able to get someone from Todd Akin's office to speak with us.
     * Craig is talking to someone involved w/ the Obama campaign.     * Craig is talking to someone involved w/ the Obama campaign.
 +    * Scott Nesler offered to present [[http://​www.dogoodgauge.com|Do Good Gauge]] concept as a main topic or lead in.
   * Red Hat Enterprise Linux 5 (RHEL 5)   * Red Hat Enterprise Linux 5 (RHEL 5)
     * Still looking for volunteer; tried Clark Smith at Red Hat     * Still looking for volunteer; tried Clark Smith at Red Hat
steercom/2008-08.txt ยท Last modified: 2008/08/11 15:46 by 70.242.159.89