User Tools

Site Tools


steercom:2018-06

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Last revision Both sides next revision
steercom:2018-06 [2018/06/04 19:11]
SLUUG Administration [Hazelwood - May 22]
steercom:2018-06 [2018/06/04 20:17]
SLUUG Administration [Recurring Requirements]
Line 245: Line 245:
   * [[http://​www.stllinux.org/​|STLLUG]] is the St. Louis Linux Users Group.   * [[http://​www.stllinux.org/​|STLLUG]] is the St. Louis Linux Users Group.
  * VENUE Nick and Elena'​s Pizzeria, 3007 Woodson Rd, Overland, MO 63114  * VENUE Nick and Elena'​s Pizzeria, 3007 Woodson Rd, Overland, MO 63114
-    * TOPIC: To Be Determined (TBD) 
     * The following topic has been listed on the web site as tentative for either June or July.  Stan R would prefer waiting for July if we can find something else for June.     * The following topic has been listed on the web site as tentative for either June or July.  Stan R would prefer waiting for July if we can find something else for June.
-    * TENTATIVE: ​Shootout with current distros (various artists -- bring your favorite)+    * Shootout with current distros (various artists -- bring your favorite)
       * Some major distros (top 20 or so on [[http://​DistroWatch.com|Distrowatch]]) either have been or are in the process of coming out with new releases.       * Some major distros (top 20 or so on [[http://​DistroWatch.com|Distrowatch]]) either have been or are in the process of coming out with new releases.
         * MX-Linux 17.1 was released 14 March.         * MX-Linux 17.1 was released 14 March.
Line 260: Line 259:
         * LinuxMint 19 series BETA (based on Ubuntu 18.04 LTS) was just released today (4 June).         * LinuxMint 19 series BETA (based on Ubuntu 18.04 LTS) was just released today (4 June).
         * Elementary OS 5.0 Juno nearing BETA release (maybe in June).         * Elementary OS 5.0 Juno nearing BETA release (maybe in June).
-        * +        * OpenELEC (Stan) 
 +        * SuSE (Lee) -- remind Lee to show BitWarden 
 +        * Mint 19 released 4 Jun (Stan)
       * :?:       * :?:
  
Line 296: Line 297:
       * :?:       * :?:
     * MAIN (Enterprise Computing):     * MAIN (Enterprise Computing):
-      * Lee -- Raspberry Pi on Desktop +      * Tentative: ​Lee -- Raspberry Pi on Desktop ​(KODI or OpenELEC) 
-      * Alternative+      * Tentative ​Alternative
         * Steve -- Raspberry Pi mail system to replace existing enterprise grade email system         * Steve -- Raspberry Pi mail system to replace existing enterprise grade email system
-      * :?:+      * TentativeAndrew St Clair -- report on upgrade to SLUUG email system
  
 ==== STLLUG - July 19 ==== ==== STLLUG - July 19 ====
Line 372: Line 373:
   * Link to [[/​steercom/​potential]] tutorials, topics and speakers.   * Link to [[/​steercom/​potential]] tutorials, topics and speakers.
   * NOTE: Steering Committee usually meets on Monday of the week prior to (9 days) General Meeting.   * NOTE: Steering Committee usually meets on Monday of the week prior to (9 days) General Meeting.
-  * NOTE: This would cause the meeting to fall on Labor Day +  ​* **NOTE: This would cause the meeting to fall on Labor Day** 
   * :?:    * :?: 
  
Line 432: Line 433:
     * BOCK Transition team met in Bat Cave on Wednesday 23 and Wednesday 30 May. Next session will be Wednesday 6 June.     * BOCK Transition team met in Bat Cave on Wednesday 23 and Wednesday 30 May. Next session will be Wednesday 6 June.
     * Bock transition Team members Chuck Doolittle, Don Ellis (23 May), Mike Knight, Lee Lammert, Andrew St Clair, Stan Reichardt, and Steve Stegmann     * Bock transition Team members Chuck Doolittle, Don Ellis (23 May), Mike Knight, Lee Lammert, Andrew St Clair, Stan Reichardt, and Steve Stegmann
-    * Chuck Doolittle volunteered to set up LetsEncrypt free SSL certificates on BOCK. +    * Chuck Doolittle volunteered to set up *automated* ​LetsEncrypt free SSL certificates ​for websites ​on BOCK. 
-    * :?: +    * AndrewWe have running todo list on sysadmin tasks
   ​   ​
-===== Free SSL Certificates ​ ===== 
-  * SUMMARY: Free is good. 
-  *  
-  * 2017-01-30 for FEBRUARY 
-    * Proposed to test at one site; can do implementation during a meeting as a presentation/​group exercise. Will test 4 months before switching to another site. Directive to redirect will have to wait until very end. 
-  * 2017-06-05 for JUNE 
-    * LetsEncrypt certs 
-      * Amber is too old -- CentOS 5 is too old for basic installation. VM; no access to console. VM is running on Contegix system. Upgrading OS is hard to do; will instead move to new machine (Nick) 
-      * LetsEncrypt could be set up on Bud 
-  * 2017-06-26 for JULY 
-  * 2017-07-31 for AUGUST 
-  * 2017-08-28 for SEPTEMBER 
-  * 2017-10-02 
-  * 2017-10-30 for NOVEMBER 
-  * 2017-12-04 
-  * 2018-01-02 
-  * 2018-02-06 
-  * 2018-03-05 
-  * 2018-04-02 
-    * Lee: After new servers are built, this will be moot and this section can be deleted 
-  * 2018-04-30 for MAY 
-  * 2018-06-04 
-    * Chuck Doolittle volunteered to set up LetsEncrypt free SSL certificates on BOCK. 
-    * :?:  
  
 ===== Web Site SLUUG.ORG Maintenance ===== ===== Web Site SLUUG.ORG Maintenance =====
Line 505: Line 482:
     * Special Interest Group meeting sites SLACC, STLLINUX and Hazelwood have been updated for June.     * Special Interest Group meeting sites SLACC, STLLINUX and Hazelwood have been updated for June.
     * General meeting home page is a work in progress. ​ What sponsor do I remove?     * General meeting home page is a work in progress. ​ What sponsor do I remove?
 +      * Lee: better question is "what sponsors do I keep?"
     * :?:      * :?: 
  
Line 613: Line 591:
       * Don is testing revised configuration       * Don is testing revised configuration
   * 2018-06-04   * 2018-06-04
-    * :?: +    * DonNo progress yet -- will revisit next month
  
 ===== Uploading Presentations ===== ===== Uploading Presentations =====
Line 644: Line 622:
     * Stan R has not yet made progress     * Stan R has not yet made progress
   * 2018-06-04   * 2018-06-04
-    * :?: +    * StanHD is still in plastic bag
  
 ===== Sponsorships ===== ===== Sponsorships =====
Line 667: Line 645:
   * 2018-04-30 for MAY   * 2018-04-30 for MAY
   * 2018-06-04   * 2018-06-04
-    * :?: +    * Nada 
  
 ===== Library Room Reservations ===== ===== Library Room Reservations =====
Line 719: Line 697:
     * :?:      * :?: 
  
-===== Web Components Group ===== 
-  * 2018-04-02 
-    * Gary: Web Components Group from Meetup.com seems to be dwindling. Should we take WebDev mailing list & pass to Web Components Group? 
-      * Lee: no, use WebDev mailing list to promote to Web Components, after getting permission. Gary will email Lee to remind him to do this. 
-  * 2018-04-30 for MAY 
-  * 2018-06-04 ​ 
-    * Stan R keeps looking at this and doesn'​t understand anything about it. What it is, what needs to be done and what should be done when it is finished. 
-    * Was Stan R supposed to delete this section? ​ Maybe Stan R just can't remember what he had for breakfast. 
-    * :?: 
  
 ===== We Need Help ===== ===== We Need Help =====
Line 761: Line 730:
 ===== Any New Business ===== ===== Any New Business =====
   * 2018-06-04 ​   * 2018-06-04 ​
-    * :?:+    * Thoughts about announcing workshops for summer meetings instead of actual topics. Prevent having to develop presentations. OTOH, would be helpful to have topics for the workshops, so not zero effort.
  
 ====== Recognize Useful Efforts ====== ====== Recognize Useful Efforts ======
Line 774: Line 743:
     * Some ideas should be publicized.~ SHOULD BE RECORDED!     * Some ideas should be publicized.~ SHOULD BE RECORDED!
   * 2018-06-04 ​   * 2018-06-04 ​
-    * :?:+    * In order to not record or start recording, record operator needs to be notified.
  
 ====== Recurring Requirements ====== ====== Recurring Requirements ======
   * June 2018 - BuddyNS SLUUG account due   * June 2018 - BuddyNS SLUUG account due
 +    * Lee is updating account
   * June 2018 - Missouri Annual Report for Corporate Legal Status due.   * June 2018 - Missouri Annual Report for Corporate Legal Status due.
     *  https://​bsd.sos.mo.gov/​BusinessEntity/​BusinessEntityDetail.aspx?​page=beSearch&​ID=681250     *  https://​bsd.sos.mo.gov/​BusinessEntity/​BusinessEntityDetail.aspx?​page=beSearch&​ID=681250
 +    * Lee is considering changing mailing address
   * July 2018 - SLUUG.ORG domain is domain automatic renewal? Is it with Dotster?   * July 2018 - SLUUG.ORG domain is domain automatic renewal? Is it with Dotster?
 +    * Lee is going to update credit card info
   * October 2018 - First Saturday, reserve rooms at St. Louis County Library Branches.   * October 2018 - First Saturday, reserve rooms at St. Louis County Library Branches.
   * December 2018 - STLWEBDEV.ORG is domain automatic renewal?   * December 2018 - STLWEBDEV.ORG is domain automatic renewal?
steercom/2018-06.txt · Last modified: 2018/06/04 20:20 by SLUUG Administration