steercom:2007-09 [2007/09/05 19:25]
64.241.37.140 Second save during meeting. (CMB)
steercom:2007-09 [2007/09/11 17:50] (current)
70.242.147.52 Listed where I saw $300 sponsorship amount. -stanr.
Line 14: Line 14:
 ====== Date and Time ====== ====== Date and Time ======
   * Wednesday, 5 September 2007   * Wednesday, 5 September 2007
-  * 6:30 pm -+  * 6:30 pm - 8:30 pm
  
 ====== Attendees ====== ====== Attendees ======
Line 21: Line 21:
   * Lee Lammert   * Lee Lammert
   * Stan Reichardt   * Stan Reichardt
-  * ?? Gary Meyer +  * Gary Meyer
-  * ?? Jeff Muse+
  
 ====== Secretary Report ​ ====== ====== Secretary Report ​ ======
Line 84: Line 83:
     * Any postings from subscribers must be manually released.     * Any postings from subscribers must be manually released.
     * Added Gary Meyer as monitor capable of releasing items, but his default address won't work.     * Added Gary Meyer as monitor capable of releasing items, but his default address won't work.
-    * About 24 subscriptions suspended due to excessive bounces. ​+    * About 24 subscriptions suspended due to excessive bounces
 +      * Most had been suspended for more than two weeks
       * System did not seem to reuse, so Stan manually unsubscribed them.       * System did not seem to reuse, so Stan manually unsubscribed them.
     * Latest weekly ANNOUNCE EVENTS mailing sent out on 2 September.     * Latest weekly ANNOUNCE EVENTS mailing sent out on 2 September.
Line 188: Line 188:
 ==== SLACC - October 4 ==== ==== SLACC - October 4 ====
   * Linux Configuration Workshop - No presentation.   * Linux Configuration Workshop - No presentation.
 +
 +==== STL County Library - October 6 ====
 +  * First Saturday in October, annual event.
 +  * Meeting rooms must be scheduled for next year.
  
 ==== HOLIDAY - October 8 ==== ==== HOLIDAY - October 8 ====
Line 277: Line 281:
   * Untangle Gateway Platform (instead of CentOS Linux) by Tim Dreste (Tentatively October, via Stan R).   * Untangle Gateway Platform (instead of CentOS Linux) by Tim Dreste (Tentatively October, via Stan R).
   * AIX 6 - due out later this year (about November, IBM via John Hodge)   * AIX 6 - due out later this year (about November, IBM via John Hodge)
-  * Another presentation from Tom Bowman at TeamCentric Technologies (via Craig) ​ +  * Another presentation from Tom Bowman at TeamCentric Technologies (via Craig)
-  * History of tech since 1968 from Scott Granneman (via Gary).+
   * Building a modern kernel by Ed Howland.   * Building a modern kernel by Ed Howland.
   * Using git by Ed Howland.   * Using git by Ed Howland.
Line 290: Line 293:
       * Packet Types (management,​ data frames, beacons, probes).       * Packet Types (management,​ data frames, beacons, probes).
     * Part 2: Practical Linux Wireless configuration.     * Part 2: Practical Linux Wireless configuration.
-      * Cards, ​compatiblity.+      * Cards, ​compatibility.
       * NDISWrapper and native (devicescape stack).       * NDISWrapper and native (devicescape stack).
       * Drivers       * Drivers
Line 298: Line 301:
  
 ====== Sponsorships ====== ====== Sponsorships ======
-  * Annual sponsorship ​is $200 for Businesses and $300 for Large Enterprise Corporations.+  ​* Some old information has: 
 +    ​* Annual sponsorship ​as $200 for Businesses and 
 +    * $300 for Large Enterprise Corporations.  This amount show on sluuginfo.pdf (18 April 2007) handout. 
 +    * The $300 amount not viable, so sponsorships are $200. 
 +    * Stan will purge any $300 amount from web site and forms.
   * Have the current paying sponsors been asked to renew (with payment)?   * Have the current paying sponsors been asked to renew (with payment)?
-    * Ajilon +    * Ajilon ​(Stan to follow up) 
-    * S3 - Stratigic ​Staffing Solutions +    * S3 - Strategic ​Staffing Solutions ​(Craig to follow up) 
-    *  +  * Potential sponsors 
-  We in fact recogize multiple entities as sponsors due to community support or services in kind. +    * SyllogisTeks - Susan Smith 
 +    Sun - Jeff Logullo 
 +    * IBM - (John Hodge may have a contact) 
 +    * Red Hat - Clark Smith (Craig ​to follow up) 
 +    * Novell / SuSE - Matt Skipton
   * We should review them once or twice annually and establish an end date on recognition.   * We should review them once or twice annually and establish an end date on recognition.
-  * They are:+  * We in fact recognize multiple entities as sponsors due to community support or services in kind. 
     * EPC - STLLUG Installfest,​ STL BusExpo hardware use & handout printing support, SLUUG discount.     * EPC - STLLUG Installfest,​ STL BusExpo hardware use & handout printing support, SLUUG discount.
     * Computers & Things - STLLUG Installfests,​ STCLUG projector & STL BusExpo printing support.     * Computers & Things - STLLUG Installfests,​ STCLUG projector & STL BusExpo printing support.
Line 314: Line 325:
     * Law Offices of Rich McLennen - legal services as needed.     * Law Offices of Rich McLennen - legal services as needed.
     * UMSL-MicroLabs - The St. Louis Security Group meeting lab area.     * UMSL-MicroLabs - The St. Louis Security Group meeting lab area.
-    *  +  ​* Should ​Omnitec ​be recognized as a sponsor? 
-  ​* Should ​Omnitek ​be recognized as a sponsor? +    * Stan suggested ​that we add Omnitec as an official sponsor. 
-    * Consider ​that Omnitek ​has been providing services in kind comenserate ​with other sponsors. +      * Omnitec ​has been providing services in kind commensurate ​with other sponsors. 
-    * Working on logo for SLUUG website rotating front page display (stan r). +      * All attending were in favor (except Lee, who abstained) 
-    *  +    * Working on logo for SLUUG website rotating front page display (Stan R.) 
-  * New Sponsor - SylLogisteks ​ +  * New Sponsor - SyllogisTeks 
-    * They has been providing door prizes and paying room fee for STLLUG meetings.+    * They have been providing door prizes and paying room fee for STLLUG meetings.
     * They were to have mailed a sponsorship check for $200.     * They were to have mailed a sponsorship check for $200.
-    * Working on logo for SLUUG website rotating front page display (stan r)+    * Working on logo for SLUUG website rotating front page display (Stan R.) 
-    * +    * Attendees were in favor of adding logo to our site before receiving money.
   * Possible Sponsor - pcMemoryStore   * Possible Sponsor - pcMemoryStore
     * Wanted to provide member discounts in lieu of $200 annual (per Lee).     * Wanted to provide member discounts in lieu of $200 annual (per Lee).
     * Not sure it makes financial sense.     * Not sure it makes financial sense.
-    * +    * We decided to make it a benefit for our members. 
 +    * Attendees voted 3-0-2 (for-against-abstain) to make them a sponsor in kind for discounts. 
 +    * Lee will follow up w/ PC Memory Store.  
 +      * Need to get coupon code from them. 
 +    * Stan will add to Sponsors page when we get coupon code.
   * Need sign about sponsoring our group for booth/table display at meetings and trade shows.   * Need sign about sponsoring our group for booth/table display at meetings and trade shows.
   * More effort should be directed to find new sponsors.   * More effort should be directed to find new sponsors.
-    * No effort means no more new sponsors. ​  +    * No effort means no more new sponsors.
-    *  +
- +
-====== System Administration ====== +
-  * Backup and restore for BUD and BUDLIGHT? +
-  *+
  
 ====== Server Migration Project ====== ====== Server Migration Project ======
-  * AUG - Work left to do: +  * Work left to do: 
-    * AUG - Make sure docs are up to date. +    * Make sure docs are up to date. 
-      * AUG - Add documentation telling users how to configure mail clients to use Bud. +      * Add documentation telling users how to configure mail clients to use Bud. 
-      * AUG - Started documenting client email configurations,​ to help users migrate. +      * Started documenting client email configurations,​ to help users migrate. 
-      * AUG - See [[../​users]] ​page. +      * See [[../​users]] ​and [[../​mail_setup]] ​pages. 
-      * AUG - It was suggested that the Mail Clients sections be split out to separate pages to reduce overall size. +    * Start migrating individual users. 
-      * AUG - Carl - Split out Mail Clients ​pages on users wiki document+      * Make sure we have documentation on what we need to migrate. 
-    * AUG - Start migrating individual users. +    * Rebuild Budlight. 
-      * AUG - Make sure we have documentation on what we need to migrate. +      * Carl may rebuild using virtual machines. 
-    * AUG - Rebuild Budlight. +    * Craig - Work on finishing server builds. 
-      * AUG - Carl may rebuild using virtual machines. +      * Document changes to PAM to correct MAIL variable. (Craig) 
-    * AUG - Craig - Work on finishing server builds. +      * Get offsite backups working. 
-      * AUG - Document changes to PAM to correct MAIL variable. (Craig) +      * Put SSH host keys on web page. 
-      * AUG - Get offsite backups working. +      * Work with Ed Wehner to migrate gateway-l and archrivals lists. 
-      * AUG - Put SSH host keys on web page. +      * Migrate USERS mailing list. 
-      * AUG - Work with Ed Wehner to migrate gateway-l and archrivals lists. +  * Other work to do:
-      * AUG - Migrate USERS mailing list. +
- +
-  * Server Build progress+
     * Jeff working on virus scanning     * Jeff working on virus scanning
     * Craig working on Drupal     * Craig working on Drupal
Line 365: Line 372:
   * Each website has skeleton presentation page listing topics given to date.   * Each website has skeleton presentation page listing topics given to date.
   * No routine presentation uploads yet.   * No routine presentation uploads yet.
- 
  
 ====== SLACC as a SIG ====== ====== SLACC as a SIG ======
-  * JUL -Carl spoke with Noel about moving the SLACC.com domain website. +  * Carl spoke with Noel about moving the SLACC.com domain website. 
-  JUL - Carl - Call Noel about transferring SLACC.com domain. +    * Noel will send Carl the access code to transfer registration. 
-    * AUG -Yes. Carl to follow up. +    * The registration is paid up until 2009. 
- +    * Noel asked that we allow current email users to keep their SLACC.com ​email addresses.
-In process. Noel is sending me the access code to transfer registration. The registration is paid up until 2009. He asked that we allow current email users to keep their email addresses. +
  
 ====== Membership (and Shell Accounts) ====== ====== Membership (and Shell Accounts) ======
-  * AUG - Stan and Craig met earlier on August 1 to work out membership ​issues+  * The membership ​form was approved, with some minor changes
-    AUG - See the wiki [[../membership]] page. +  The membership wiki page was approvedafter making changes suggested last month
-  * AUG - Those present read through the write-up on the wiki page+
-  * AUG - Recommendations from the group: +
-    * AUG - Make it clear that the primary benefit is to support the group. +
-    * AUG - Give away an item (from [[http://​www.cafepress.com/​sluug | our CafePress page]]) for each level +
-      * AUG - Platinum level - golf shirt +
-      * AUG - Gold level - t-shirtmug, or baseball cap +
-      * AUG - Silver level - bumper sticker (excluding the $10 level) +
-    * AUG - No longer need to follow July - June billing cycle. +
-      * AUG - Each member will renew 1 year from their start date. +
-  * AUG - Craig to rework the membership page a bit. +
-    * AUG - Will post URL to STEERCOM for confirmation/​vote. +
   * Membership drive   * Membership drive
-    * AUG - Membership drive will start in September. +    * Membership drive will start in September. 
-    * Carl mentioned it at SLUUG meeting +    * Carl mentioned it at SLUUG meeting. 
-    * Craig has written up sign-up form +    * Lee to order CafePress ​items ASAP to have some membership gifts on-hand. 
-    * Craig has fixed up [[../​membership]] info page +      We had approved ​$150 last month
-      * Is everyone OK with its current form? +    * Stan to add CafePress link to SLUUG web site when we get info. 
-    * Carl - order items from Cafe Press +    * Stan to link new membership page into SLUUG web site
-    * Are we ready to promote and accept dues? +  * It was suggested that we use Scott Nessler'​s logos
-    * AUG - Carl will spend $150 to buy membership gifts to have on-hand. +    * We should ​ask Scott
-    AUG - Carl - Buy $150 of membership gifts from CafePress to have on-hand+    * We should ​post the choices ​to STEERCOM ​for voting ​to make it official.
-    * SEP - Merchandise ordered +
-    * AUG - Unanimous support from committee ​to spend this amount. +
-    * AUG - After that point, Stan will add CafePress link to SLUUG web site+
-  * AUG - We talked about making the logos that Scott Nesler made official logos. +
-    * AUG - Will post URLs to options on STEERCOM, and vote on them there. +
-  * AUG - NOTE: Membership sign-ups must include form with user info+
-  * AUG - Craig - Was to fix up membership page, per recommendations+
-    * AUG - Was to post URL to STEERCOM for confirmation/​vote. +
-  * AUG - Lee - Consider online database for membership ​applications/​renewals. +
- +
-====== Publicity Handouts ====== +
-  * AUG - Craig and Stan met earlier on August 1 to work on handouts. +
-    * AUG - Reviewed and mapped out improvements to the brochures we have. +
-    * AUG - Decided to include a page telling when/where all our meetings are. (Craig working on) +
-  * AUG - Stan had previously created a St. Charles LUG brochure on GNU/Linux resources. +
-    * AUG - Added link to PDF on [[http://​www.sluug.org/​resources/​handouts/​ | SLUUG Handouts]] ​web page. +
-    * AUG - Will add link to PDF on STCLUG web page+
-  * AUG - Need about 200 copies of all brochures+
-    * AUG - Carl was to ask EPC to print 200 copies of each+
-    * AUG - After event at EPC we should ​ask for volunteer on DISCUSS ​to print any shortages. +
-  * Craig wrote up calendar sheet on meetings. +
- +
-====== Hardware Donations ====== +
-  * JUL - Gary has an additional (E250?) Sun box to put into production ​for our members ​to access. +
- +
-  * AUG - Jeff has an RS/6000 to get rid of. +
-    * AUG - 300 MHz, 512 MB, 18 GB+36 GB drives +
-    * AUG - Has PCI bus, so will run AIX 5.3. +
-    * AUG - Tower system. +
-    * AUG - Would be a good system to use once we retire Michelob and/or Dark. +
-      * AUG - We don't have space otherwise. +
-    * AUG - Jeff would be willing to build it with AIX 5.3 if someone has CDs. +
-      * AUG - Currently running AIX 5.1. +
-    * AUG - If Jeff can get assistance from others, we can use it. +
- +
-  * Nik Moon has some equipment to donate. +
-    * List of items was posted to STEERCOM list. +
-    * Concensus is that this is more stuff than we can deal with using. +
-    * Nik so advised by Stan R.+
  
 ====== Other Old Business ====== ====== Other Old Business ======
   * What did we forget about?   * What did we forget about?
- 
- 
  
 ====== New Business ====== ====== New Business ======
-  * Do we have anything else? +  * [[http://​www.stchman.com/​ | Bob Nelson]] - [[http://​ubuntuforums.org/​archive/​index.php/​t-466368.html | wants to start an Ubuntu LoCo]] 
 +    * Carl and/or Craig to follow up (Stan will send info). 
 +    * EPC would probably like to hold the meetings.
  
 ====== Blue Sky ====== ====== Blue Sky ======
   * Is it still up there?   * Is it still up there?
-Unknown, it is raining and overcast today. (the sky is falling!!!)+    * Unknown, it is raining and overcast today. (the sky is falling!!!)
  
 ====== Follow-up and Action Items ====== ====== Follow-up and Action Items ======
-  * AUG - Jeff - Seek assistance from AIX gurus to see if we want to set up his box. +  * Jeff - Seek assistance from AIX gurus to see if we want to set up his box. 
-  * AUG Stan Work on updating brochures on membership issues+  * Lee Follow up drafting reply to Wash U. 
-  * Lee - follow ​up drafting reply to Wash U+  * Lee Place CafePress order ASAP(DONE) 
-  * Craig - Email Clark Smith @ Red Hat about getting someone to present on RHEL5. +  * Lee - Follow ​up w/ PC Memory Store and get coupon code from them
-  * Stan follow ​up w/ Clarence and Chris Byrd to get topic for Security ​meeting. +  * Craig - Email Clark Smith @ Red Hat about getting someone to present on RHEL5, and $200 sponsorship
-  * Carl - follow ​up w/ Scott Nessler about PHP-Nuke at STCLUG. +  * Craig Email Jim Leingang @ S3 about $200 sponsorship. 
-  * Carl - follow ​up w/ John Pitney about future STCLUG presentation. +  * Craig - Ask Brian Button / Kyle Cordes about XP-STL / SLUUG joint meeting. 
-  * Craig - follow ​up w/ Tom Bowman of TeamCentric about October 18 meeting. +  * Craig - Follow ​up w/ Tom Bowman of TeamCentric about October 18 meeting. 
 +  * Carl - Follow ​up w/ Scott Nessler about PHP-Nuke at STCLUG. 
 +  * Carl - Follow ​up w/ John Pitney about future STCLUG presentation. 
 +  * Stan - Add Omnitec and Syllogistek as sponsors. 
 +  * Stan - Send info on Bob Nelson (Ubuntu advocate) to Carl and Craig
 +  * Stan Ask Ajilon about continuing $200 sponsorship. 
 +  * Stan - Follow ​up w/ Clarence and Chris Byrd to get topic for Security ​meeting. 
 +  * Stan - Follow up with Tim Dreste about a presentation. 
 +  * Gary - Prepare Sun E250 for potential use. 
 +  * Gary - Turn in receipt for domain registration. 
 +  * Gary - Organize October 2 event at Small Business Expo.
steercom/2007-09.1189038339.txt.gz · Last modified: 2007/09/05 19:25 by 64.241.37.140