SLUUG Steering Committee Agenda - 6 June 2012

NOTE: Minutes posted on the wiki are always unofficial. Schedules for upcoming presentations are always tentative. (Some more tentative than others!)

Location

Saint Louis Bread Company,
(at Old Olive and Olive),
10550 Old Olive Street Road,
Creve Coeur, MO 63141

Date and Time

     June 2012      
Su Mo Tu We Th Fr Sa
                1  2
 3  4  5  6  7  8  9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
  • Wednesday, June 6, 2012
  • 6:50 PM - 8:10 PM

Attendees

  • Craig Buchek
  • Don Ellis
  • Gary Hollingsworth
  • Lee Lammert
  • Jeff Muse
  • Stan Reichardt
  • Bob Sherrill
  • Jerry Stutte
  • Noah Lance

Agenda Changes

  • Are there any additions, deletions, or changes to sequence of items in the prepared agenda?
  • Move up item on Bridge Outreach charity support.

Support of Bridge Charity

  • History of SNUG charitable supporting BRIDGE charity
  • BRIDGE has appealed for additional support
  • TWO (2) funding questions proposed by Gary Hollingsworth:
    • First (1st) specifically to continue support for BRIDGE internet connection.
    • Second (2nd) authorize additional contributions.
  • After discussion, unanimous decision to provide $55 per month.

Secretary Report

  • No report. (Secretary was here, but had not been for several months.)

Treasurer Report

Balance as of 4/1$2,941.43
Credit (+) Debit (-)
BuddyNS 30.00
Balance as of 4/30 $2,911.43

* Thank you to Bryce Meyer for the Membership Purchase!

Attendance Report

  • Initial mail list subscriptions are prompted by attendance sheets.
  • Group leaders are responsible for taking attendance at meetings.
  • Blank attendance sheets are available here
  • Attendance numbers, as of end of May 2012:
Meeting May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May
Steercom 11 5 6 (5) 3 5 6 5 5 6 4 7 5
SLACC 5 8 5 ? (4) (7) ? 4 8 10 7 ? 5
SLUUG 19 21 18 12 26 14 15 16 13 18 9 23 11
SNUG SuSE ? 8 7 (8) 11 9 9 - 9 9 8 9 9
STLLUG 15 14 15 - 18 9 20 ? 20 14 - ? 8
STCLUG 7 7 1 4 6 - - - - - - - -
HZWLUG 9 (7) 8 ? 7 8 5 5 9 11 7 6 8
  • NA - Not part of SLUUG. Jeff asked why this option is still listed.
  • () - Number in parentheses is head count.
  • xx - attendance was taken, numbers not yet recorded.
  • ? - Question mark indicates attendance not taken or sheet missing.
  • - - dash indicates no meeting.
  • NOTE - Corrected STCLUG August 2010 and September 2010 counts.
  • NOTE - February 2011 Steercom was via IRC #SLUUG channel on freenode.
  • NOTE - Oct 2011 SLUUG and STLLUG meetings were during a STL Cardnal's baseball game.

Calendar Report

  • SLUUG Calendar is a Google Calendar available on our web site.
  • This is a calendar of technical events in the Greater St. Louis area and surrounding regions.
  • Not all events are official SLUUG events.
  • Items have been added and corrected by Stan R, Gary Meyer and Don Ellis.
  • Items listed on this calendar feed the ANNOUNCE weekly mailing.
  • Count of number of events listed, each month, as of end of May 2012:
Calendar May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May
EVENTS 103 117 105 105 105 113 103 96 110 104 122 123 xxx
  • xxx - Numbers not yet counted.

Mailing List Report

  • Subscriber numbers (approximate) as of end of May 2012:
List May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May
ANNOUNCE 704 701 704 704 700 695 667 667 668 670 673 673 671
DISCUSS 215 215 215 211 211 208 206 206 209 208 207 210 209
STEERCOM 37 37 37 35 35 35 35 35 34 33 32 32 32
SYSADMIN 17 17 17 17 17 16 16 16 16 16 16 15 16
  • Numbers as end of each month.
  • Blocking of mailing list attachments not completely configured yet. This will be much easier to do on Amber.
  • ANNOUNCE mailing list.
    • Still no volunteer editor to do a quarterly or monthly newsletter.
  • Command used to generate these (as root on Bud):
    • /usr/local/mailman/bin/list_members list_name | wc -l

Meeting Review and Comments

May 2012

      May 2012      
Su Mo Tu We Th Fr Sa
       1  2  3  4  5
 6  7  8  9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31

SLACC - May 3

* SLACC usually holds a Linux configuration workshop - no presentation

  • SLACC home web page has been posted.

SLUUG - May 9

* SLUUG usually starts with a tutorial or demo session before a main presentation.

  • BASE: Grouping Firefox Tabs by Stan Reichardt
    • A live non-structured demonstration. Went longer than expected, because of questions.
    • Good.
  • MAIN: Splunk (hooks to Nagios) by Alan Griggs via Jerry Stutte
    • Nice job. Liked the way he asked questions and answered them.

SNUG - May 16

  • SNUG is the St. Louis Novell Users Group.
  • TOPIC: The Latest and Upcoming in Open Enterprise Server and Filr - Glen Davis & Ted Tronson, Novell
    • Very good; interesting.

STLLUG - May 17

  • STLLUG is the St. Louis Linux Users Group.
  • TOPIC: Video configuration by Lee Lammert and Don Ellis
    • Troubleshooting session, lots of input.

HZWLUG - May 22

  • HZWLUG topics are usually determined by attendees. We usually cover more than one.
    • Installed Ubuntu for a new person.

STCLUG - May 24 HIATUS

  • STCLUG is the St. Charles Linux Users Group.
    • On Hiatus

Presentation Schedule

Potential Presenters and Topics

June 2012

     June 2012      
Su Mo Tu We Th Fr Sa
                1  2
 3  4  5  6  7  8  9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30

SLACC - Jun 7

  • SLACC usually holds a Linux configuration workshop - no presentation
    • SLACC home web page has been posted

SLUUG - Jun 13

  • SLUUG usually starts with a tutorial or demo session before a main presentation.
  • BASE: Debugging Email by Jeff Muse
  • MAIN: Managing Xen with OpenNebula by Noah Lance

SNUG - Jun 20

  • SNUG is the St. Louis Novell Users Group.
  • TOPIC: GroupLink HelpDesk product demonstration by GroupLink (tentative)

STLLUG - Jun 21

  • STLLUG is the St. Louis Linux Users Group.
  • TOPIC: Automated Web App Testing with Cucumber and Selenium by Craig Buchek

HZWLUG - Jun 26

  • HZWLUG topics are usually determined by attendees. We usually cover more than one.

Potential Presenters and Topics

July 2012

     July 2012      
Su Mo Tu We Th Fr Sa
 1  2  3  4  5  6  7
 8  9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31

SLACC - Jul 5

* SLACC usually holds a Linux configuration workshop - no presentation

  • SLACC home web page has been posted

SLUUG - Jul 11

* SLUUG usually starts with a tutorial or demo session before a main presentation.

  • BASE: To Be Determined (TBD)
  • MAIN: SystemD by Jerry Stutte

SNUG - Jul 18

  • SNUG is the St. Louis Novell Users Group.
  • TOPIC: To Be Determined (TBD)

STLLUG - Jul 19

  • STLLUG is the St. Louis Linux Users Group.
  • TOPIC: Asterisk Soft Phones on Linux by Don Ellis and Lee Lammert

HZWLUG - Jul 24

  • HZWLUG topics are usually determined by attendees. We usually cover more than one.

Potential Presenters and Topics

Old Business

Server Admin

  • Fixed GoldenWheat (1U server)
  • Acquired 2x2U Dell and 2x2U IBM sets of HW
  • Configured one as a new VM server
  • ToDo (from Noah Lance):
  • Finalize Network (openvswitch isn't happy with linux 3.1), Web GUI, Host monitoring/management configurations
  • Build storage configuration - NFS server for images (templates) and home dirs for all VMs
  • Validate Web GUI functionality
  • Setup Debian 6 VMs for Bud & Budlight
  • Attempt p2v of Amber so updates can be tested before pushing to production
  • Possible future enhancement - LDAP/Kerberos for SSO to production servers?
  • Need to resolve CNAME/A Record issue for sluug.org?
  • 2010-07 - Renewed SLUUG.ORG domain during 9 July migration work party.
  • 2011-08 - EveryDNS migration to DynDNS caught us unprepared. Craig moved us to buddyns.
    • Lee has made copies of zone files and we have BIND on amber now as an authoritative server.
    • We should probably make sure buddyns has up-to-date contact info.
  • 2011-12 Michelob is dead.
    • Joe B. Volunteers to do fix on Michelob, will get together with Gary M.
  • 2012-01
  • 2012-02 Lee installed Webalizer on the new servers, per Stan R's request.
  • 2012-03 Stan R is getting some technical response of his email problem.
    • Much discussion of Mike Knight's research and possible work around.
    • Don and Gary did some testing using Apple mail clients, with results showing same problems.
  • 2012-04 Need to run updates on AMBER or plan for alternate virtual install to migrate over.
  • 2012-05 Jeff Muse updated AMBER HTTPS cert.
    • Altho we believed the change would only effect that, unexpectedly, Gary's Apple eMAIL client complained about the certificate on IMAP.
  • 2012-06 Noah got 3 new servers up at Hostirian.
    • Bud (replacement) - 600 GB storage array
      • Storage for VMs
      • Storage for media (audio/video recordings of meetings)
    • Golden Wheat (replacement)
    • XenPRI - platform to run VMs
  • 2012-06 Noah has been updating docs on wiki.

Wash U Cleanup

  • 2009-09 Jerry Stutte, Jeff Muse, and Eric Xu volunteered to cleanup Wash U site.
  • 2009-09 Gary Meyer is Captain.
  • 2009-10 Captain is AWOL. Carl will be available in November or later.
  • 2009-11 Captain was AWOL.
  • 2009-12 Captain still AWOL.
  • 2010-01 Captain still AWOL.
  • 2010-02 Captain Gary Meyer still AWOL. Search party has not reported back.
  • 2010-04 Pending until next month at the earliest.
  • 2010-05 This project open since September 2009. Gary immediately left meeting.
  • 2010-06 Gary not here, nothing resolved.
  • 2010-07 Gary not here, nothing resolved.
  • 2010-09 Gary will work on this.
  • 2010-10 No progress. Stan R questioned Gary's usefulness. Suggested that he is merely decorative.
  • 2010-11 No progress. See note above about Gary's usefulness.
  • 2010-12 No progress. See note above about Gary's usefulness.
  • 2011-01 No progress. See note above about Gary's usefulness.
  • 2011-02 No progress. See note above about Gary's usefulness.
  • 2011-03 No progress. Gary is in Florida. See note above about Gary's usefulness.
  • 2011-04 No progress.
  • 2011-05 No progress.
  • 2011-06 No progress. Unless there is rain Gary won't be attending until September.
  • 2011-07 No progress.
  • 2011-08 No progress
  • 2011-09 Gary did a site survey and said "Someday….."
  • 2011-10 Gary says to repeat above response, ie "Someday….."
  • 2011-11 Table - Consensus is to do later, in Spring.
  • 2012-03 Gary provided song and dance routine. Stay tuned.
  • 2012-04 No progress. Stan R again questioned Gary's usefulness. Again suggested that he is merely decorative.
  • 2012-05 Gary protests and proclaims that decorative is useful (no progress).
  • 2012-06 Three-year anniversary of this item's proposal is rapidly approaching.

Recording Meetings

  • 2010-12
    • We have a voice recorder (VC) for recording meeting presentations and have posted some results on web site.
    • On 28 Oct Stan R suggested buying an additional VC so that there wouldn't be a single point of failure.
      • We forget who has it.
      • We forget to bring it.
      • We forget to turn it on.
      • We forget fresh batteries.
      • We forget how to turn it on.
      • We forget to free up space on it.
    • There was some STEERCOM list banter but nothing was brought up at 3 November Steering Committee meeting.
    • Alternative of video recording suggested, huge size of video files was mentioned.
    • Stan R passed voice recorder to Gary M on 18 November and doesn't want it back.
    • Noah volunteered an old Digital8 recorder.
  • 2011-01 Continued discussion, but no consensus.
  • 2011-02 Not discussed during IRC meeting.
  • 2011-03 Gary M returned voice recorder to Stan R before going to Florida.
    • Stan R needs to pull February 2011 STLLUG recording and post it (on Amber).
      • And email it to the speaker (Igor Gueths).
  • 2011-04 Stan R passed on voice recorder to Phil Bunch, who should be at next general meeting.
  • 2011-05 Phil B passed voice recorder back to Stan R.
  • 2011-05 Craig suggested getting another voice recorder (or 2), and extra batteries.
  • 2011-06 Jeff wanted to move that we use some of the Novell money to buy a second recorder.
    • Did not have a quorum.
    • Stan R suggested getting one that records in ideally OGG, but failing that, MP3.
      • Either would be better than the current uncompressed format.
  • 2011-07 Group unanimously voted to buy 2 new voice recorders.
    • As long as they do not require Windows drivers.
    • Preferably record in OGG format, or MP3 at the least.
    • Upper limit $100 each.
    • Jerry and Lee will research and purchase.
  • 2011-08 No progress
  • 2011-09 Jerry has sent pricing information to Lee
  • 2011-10 No action on voice recorders.
    • Much discussion about projectors. Jerry S will research available units.
  • 2011-11 Jerry and Lee still researching projectors and voice recorders.
  • 2011-12 Table - until somebody gets interested.
  • 2012-02 Don Ellis has been video recording presentations in recent months.
    • Need to get him to post those to the official web sites.
  • 2012-02 Jerry has an associate who can help convert voice and video recordings to MP3 and Ogg.
  • 2012-03 Jerry has an associate working on conversions. No decision on new hardware.
  • 2012-04 Michael Jackson offers to voice record meetings and provide us with sound file.
    • We need to pull server boxes and build space.
  • 2012-05 Don says that at some point he will be able to upload what he has.
  • 2012-06 Don will be able to upload to the new Bud shortly.
    • Stan will be able to link them into our web sites.

Web Site Suggestions

  • 2011-01 Mike Knight's emails regarding web site.
    • Stan R changed the copyright dates.
    • Good idea to list other Open Source friendly resources.
      • On a separate page from our own SIGs.
      • Sites like WITS, CVillage, Arch Reactor, 2600.
    • Our site layout has not changed for years.
      • Would take some effort to re-do it, and seems to be working for most people.
  • 2011-02 Stan R hasn't gotten around to building new resources page, yet.
  • 2011-03 No change.
  • 2011-04 No change.
  • 2011-05 No change.
  • 2011-06 There was brief discussion of implementing a CMS at the work party on 5/21. No decisions made.
  • 2011-07 Gary noticed Wayback machine has STOPPED archiving our server as of about May 2009.
    • It would be good to get resumption of archiving at Wayback.
      • How can we accomplish this? We don't know; so, we appointed Gary M. to find a way.
  • 2011-08 No progress.
  • 2011-09 No progress.
  • 2011-10 No progress.
  • 2011-11 No progress by Stan R.
  • 2011-12 Table - No progress by Stan R, but will work on.
  • 2012-03 Low priority
  • 2012-04 Will need to check out WebDev site stlwebdev.org
  • 2012-05 Gary M. suggests calendar page to highlight OUR, i.e. SLUUG's mtngs.
    • After all, part of the idea of maintaining the calendar is to drive traffic to our own mtngs!
      • Could be hilites on the Google calendar itself &/or additional 1-2 lines written outside the Google calendar.
      • Lee pointed out that advanced users may pull RSS that would not see the "off-Google" lines.

STLLUG Sponsorship Credit

  • 2010-11 STLLUG is the St. Louis Linux Users Group.
  • STLLUG meetings are now hosted at IT Enterprises, which is affiliated with UMSL.
  • Typically because of meeting space value we recognize host as sponsor on our web pages.
  • Previously, some educational institutions (other than UMSL) did not want to be listed.
  • Lee updated the SLUUG web site sponsors list
  • 2010-12 No status change.
  • We should push the PayPal usage.
  • 2011-01 Stan R suggested putting Hostirian at the bottom of all SIG web sites.
  • 2011-02 Stan R hasn't gotten around to the pages, yet.
    • Noticed .PNG file doesn't show up on old county library browsers. Do we have .JPG file anywhere?
    • Not discussed during IRC meeting.
  • 2011-03 No change.
  • 2011-04 No change.
  • 2011-05 No change.
  • 2011-06 No change. The spirit is willing but the schedule is weak.
  • 2011-07 Stan R added Historian logo stuff to bottom of home pages of all active Special Interest Groups.
  • 2011-08 No progress.
  • 2011-09 No progress.
  • 2011-10 Table - No progress.
  • 2012-03 Low priority
  • 2012-04 Low priority
  • 2012-05 Low priority, Stan R needs to go back and finish.
  • 2012-06 Low priority, Stan R needs to go back and finish.

Business Cards

  • Jerry suggested we print up some business cards for the group.
    • Stan R showed some examples he had done previously.
    • Group agreed this is worth doing.
    • 2012-03 Lee - got business cards printed.
      • Thank you Lee. Cards look really great! Oohhhhhhh! Ahhhhhhhhh!
      • Extra cards were given to Gary M for posting on bulletin boards.
    • 2012-04 Lee has ordered some matching stationary, 2 reams paper and 1 card stock.
    • 2012-05 Jerry has been giving them out to students and faculty.
  • 2012-06 Ask Lee if you need some.

STLLUG.ORG domain

  • 2012-03 Gary M renewed the STLLUG.ORG domain.
  • 2012-04 This points to Craig's 2011 membership survey web page. Will redesignate to current active site.
  • 2012-05 Yet to be done.
  • 2012-06 Craig to take a look at this.

New Pamphlets

  • 2012-04 - Stan R with considerable help from Christine Wanta has produced a pamphlet on Free Open Source Software (FOSS).
    • It should be very complementary to what we hawk at the St. Louis Business Expo Linux Booth.
      • The pamphlet has been added to the SLUUG Resources Handouts page
      • Another pamphlet is planned to highlight our Google calendar and list regular meeting days of the month.
      • Lee suggested a single page calendar poster also.
  • 2012-05 Stan R built new pamphlet for calendar and Free Open Source Software (FOSS).
  • 2012-06 New pamphlets have been posted to our web site (resources/handouts.
  • 2012-06 Stan will go to Lee's to print out some copies.
    • Good for handing out, especially at Business Expo.
  • 2012-06 Stan has more ideas.
    • Troubleshooting

Moving STLLUG

  • 2012-04 We need to confirm Dr. Lemon's commitment and possibly step up search for new location.
  • 2012-05 Per Stan R, Indian Trails Library Branch Auditorium is available during June to December monthly time slots, but not May.
    • Jerry offering our host (Dr. Lemon) summer months to skip.
  • Instead of skipping months, Dr. Lemon is going to provide Jerry with access card.
    • We'll hold off on considering a move, or reserving Indian Trails Library Branch Auditorium until we confirm access to projector.
  • 2012-06 No updates.

STCL Room Reservations

  • 2012-05 Stan R made reservations for SLACC and HZWLUG.
    • Checks delivered for SLACC meetings at Thornhill and Bridgeton Trails.
  • 2012-06 All taken care of.

Food and Drink

  • 2012-05 Want more.
  • 2012-06 Jerry said that some recruiters were interested in providing pizza and such.

New Embedded SIG

  • 2012-05 Lee suggested. Four maybe five folks interested.
  • 2012-06 Lee got some hardware. Looking for interested folks to find a meeting time.

Projector

  • 2012-05 We had previously agreed to buy one.
    • Would be great to possibly have a second projector at sites that already provide us with one.
    • ~$500 for WXGA Projector for Embedded SIG and meeting spare
  • Go ahead.
  • 2012-06 Have been unable to meet our criteria at the price point.

Additional Monitor

  • $200 for USB Monitor for NUI meetings
  • Funded by NUI Capital Reserves
  • 2012-05 Consideration of alternate splitter, requested and approved.
  • 2012-06 Has been purchased.

New Business

JOBS Postings

  • Historically SLUUG had discouraged postings of jobs on our mailing lists.
    • Such job postings could be perceived as SPAM.
  • With drastically lower member employment, job postings have been considered acceptable.
  • Ideally SLUUG would offer something to paid sponsors and receive credit and compensation.
  • 2012-06 Jeff Muse volunteered to create a JOBS mailing list.
    • We'll also add an archive of the list on the web.

Annual Requirements

  • July 2012 - Renew SLUUG.ORG domain.
  • July 2012 - Renew AMBER SMTPS (over SSL port 465) mail.sluug.org self-signed certificate
  • August 2012 - Missouri Annual Report for Corporate Legal Status (now every 2 years).
  • October 2012 - First Saturday, reserve rooms at St. Louis County Library Branches.
  • October 2012 - St. Louis Business Expo
  • December 2012 - Renew SLUUG.INFO domain.
  • December 2012 - Renew STCLUG.ORG domain.
  • February 2013 - Renew STLLINUX.ORG domain.
  • February 2013 - SLUUG annual Board meeting and elections.
  • March 2013 - Renew STLLUG.ORG domain.
  • March 2013 - St. Louis Business Expo
  • April 2013 - First Saturday, reserve rooms at St. Louis County Library Branches.
  • May 2013 - IRS Form 990-N for Tax Exempt Status.
  • June 2013 - BuddyNS SLUUG account

Recognize Useful Efforts

  • Recognize completed action items, and other useful actions.
  • 2012-06 Noah got some servers up and docs written.
  • 2012-06 Stan got the ANNOUNCE emails out consistently.

Blue Sky

  • 2012-05 Jerry wanted to know what we should call Blue Sky. Gary suggested Blue Sky.
    • Gary went on and on about X's email password.
    • Stan R was totally confused, not understanding email passwords were set with Jeff and Lee's web interface to something.
    • We need email password process documented (if it hasn't already been done).
    • Gary suggested we rename servers to Who, What, Where, When and Why.
    • Don suggested server names
    • Jerry suggested server names

Follow-up and Action Items

  • Everyone - Talk to someone about coming to meetings.
  • Everyone - Talk to someone about giving a presentation.
  • Noah - work on Bud/GoldenWheat build.
  • Gary - follow up with Noel about transferring the SLACC.COM domain to us.
  • Gary - get Wash U site cleaned up.